|  | COMPANY | ACTIVE | YEAR | 
			|   | WINTERSHALL LIBYA | Corrosion Risk Assessment | 2005 | 
			|   | WINTERSHALL LIBYA | Coating Inspection | 2005 | 
			|   | TOTAL CPTL | Failure Inspection El Jorf Platform | 2005 | 
			| .jpg)  | WINTERSHALL LIBYA | Pipelines UT Inspection | 2005 | 
			|   | TOTAL CPTL | Cathodic Protection Third Party | 2006 | 
			| .jpg)  | WINTERSHALL LIBYA | NDT Vessels Inspection | 2006 | 
			|   | WINTERSHALL LIBYA | Coating Inspection | 2006 | 
			| .jpg)  | TOTAL CPTL | Cathodic Protection Pre Commissioning | 2006 | 
			|   | ENI GAS B.V LIBYA | Plant shutdown inspection | 2006 | 
			| .jpg)  | WINTERSHALL LIBYA | Coating Inspection | 2006 | 
			|   | WINTERSHALL LIBYA | Coating Inspection | 2006 | 
			|   | TOTAL CPTL | Commissioning  of Cathodic Protection system | 2007 | 
			|   | ARABIAN GULF OIL COMPANY | Installation of 9 nos. Solar Energy Units, Drilling & Casing of 2 nos. deep groundbeds along the 34" Sarir –Tobruk M.O.L | 2007 | 
			|   | BREGA PETROLEUM MARKETING | Study & design of internal corrosion protection system for fire fighting system | 2007 | 
			| .jpg)  | TOTAL CPTL | NDT Inspection Eljorf Platform | 2007 | 
			|   | ARABIAN GULF OIL COMPANY | Replacement Of Step- Down Transformers For Cathodic Protection System In Nafoora Field | 2008 | 
			|   | HAROUGE OIL OPERATIONS | Sirtica Solar Station Fence And Batteries Upgrade | 2008 | 
			| .jpg)  | BREGA PETROLEUM MARKETING | Pipeline Cathodic Protection Systems Evaluation & Design Project | 2008 | 
			|   | CAPCIS / HAROUGE OAL – Jurf UT Campaignil OPERATIONS | CP ASSESSMENT PROJECT | 2009 |